Glued-down panel flooring
Step-by-step glued panel install, with every layer done properly from substrate prep right through to molding and seal.
Location
Buckinghamshire
Completed
2025-07
Duration
5 days
By
MK POL

The story
Old flooring and skirting removed back to subfloor. Damaged sections repaired before going further.
Industrial vacuumed, primed, then self-levelled to create a perfectly flat plane.
Panel layout marked, adhesive laid, panels set with consistent gaps, skirting re-cut and pinned.
Joint compound at transitions and two coats of paint on the skirting, for a polished finish that lasts.
What we did
- Strip-out
- Subfloor repair
- Priming
- Self-levelling compound
- Panel install
- Skirting & paint