Complete bathroom transformation

Outdated bathroom stripped to the brick. Re-routed plumbing, tanked walls, fresh tile layout, and a fully sealed walk-in finish.

Location
High Wycombe
Completed
2025-07
Duration
9 days
By
MK POL
Finished walk-in bathroom renovation in High Wycombe
The story

Started with a careful strip-out, protecting the hallway and stairwell.

Re-plumbed water and drainage to the new layout. New bathtub set with 24-hour settlement testing before fitting.

Walls and floor levelled and primed, tile layout dry-laid to centre the pattern, adhesive applied, grouted and cleaned.

Faucet, showerhead, sink and toilet aligned and tested. High-grade silicone applied to every wet contact point.

What we did
  • Strip-out
  • Plumbing
  • Waterproofing
  • Tiling
  • Fixtures
  • Silicone & finish